The producer is a Spanish companyworld leader in plant innovationhe is also the breeder and producer of such well-known varieties as the Tango mandarin.
In addition toprotect the emitters irrigation system, we had toclogging care in the anti-frost systems on the farm, where about 1,000 ha of avocado and Tango mandarin trees are grown.
This project was complex because of thelarge Volume of water the anti-freeze system must operate without sectorization, providing a Flow rate per hectare of 13 m3/h for the duration of the frost.
As this is a project to be carried out in different phases, the following are being installedfiltration heads as the crop grows. At the moment it already has 18 teamsAZUD HELIX AUTOMATIC 4DCL12/12FX DLP MG 130 MICRON BMDthe hourly flow rate between all of them is around 7,000 m3.
The configuration and installation of the filtering equipment allows thetotal water requirement during the application of the anti-freeze Irrigation, so that it is ensured thecorrect Operation of the system on the farm.
Double emitter pipes are used for drip irrigation of cropsAZUD PREMIER PC AS 16/1.6L 1.2mm 0.40m RD per crop row.
In addition, Dripline was also used for the rooting of the plants in the first monthsAZUD TUB PE32 D16 E1.2 where Dripper drippers are placed, which guarantee that these come through in their early stages.
As this is a project to be carried out in different phases, the following are being installedfiltration heads as the crop grows. At the moment it already has 18 teamsAZUD HELIX AUTOMATIC 4DCL12/12FX DLP MG 130 MICRON BMDthe hourly flow rate between all of them is around 7,000 m3.
The configuration and installation of the filtering equipment allows thetotal water requirement during the application of the anti-freeze Irrigation, so that it is ensured thecorrect Operation of the system on the farm.
Double emitter pipes are used for drip irrigation of cropsAZUD PREMIER PC AS 16/1.6L 1.2mm 0.40m RD per crop row.
In addition, Dripline was also used for the rooting of the plants in the first monthsAZUD TUB PE32 D16 E1.2 where Dripper drippers are placed, which guarantee that these come through in their early stages.